Fixed Foam Concrete Road Paver
₹5,00,000
Seller : Ssi Engineering
Specification
- model
- Fixed Foam Concrete Road Paver
- usage
- Road Construction Work
- finish
- Color Coated
- voltage
- 440 V
- capacity
- 140 Ton/Hours (Max.)
- material
- MS
Add Quantity
Description
In fixed form paving, side forms are used to hold fresh in place at the proper grade and alignment until it sets and hardens. These forms may also serve as tracks for various pieces of placing and finishing equipment.A paver (road paver finisher, asphalt finisher, road paving machine) is a piece of construction equipment used to lay asphalt concrete or Portland cement concrete on roads, bridges, parking lots and other such places. It lays the material flat and provides minor compaction.The essential difference between slip-form and fixed-form methods is on the way the form work is fitted. In slip-form method the form work which is attached to the paver moves along with the paver during paving operation. Compaction and finishing of concrete are carried out within the length of a single machine.